Guangzhou Fiber Optic Cable Manufacturer
ADSS Specification and Test Release Record

ADSS order control

ADSS Specification and Test Release Record

A verifiable workflow for converting aerial route data into an approved ADSS production and inspection file.

This case record shows the control points used before an ADSS order is released: route inputs, approved construction, production checks, optical testing and shipment evidence.

Project control point

An ADSS quotation is unreliable when span, wind, installation method and fittings are not aligned with the approved construction.

VERIFIABLE WORKFLOW

Control steps

01

Collect span schedule, environment, fibre count and applicable project specification.

02

Confirm cable construction, sheath marking, drum length and matched suspension or tension fittings.

03

Link the approved drawing to the production batch and drum labels.

04

Complete optical checks and prepare available OTDR, packing and loading evidence.

ADSS Specification and Test Release Record evidence

DOCUMENT CHECK

Evidence available for review

  • Approved specification and marking
  • Production and batch reference
  • OTDR or attenuation record when agreed
  • Packing photos and drum list

Handover result

The buyer receives a clearer acceptance file and can review specification, inspection and packing before dispatch.