
FTTH Outdoor Drop Cable
Pre Connectorized FTTH Drop Cable
Factory-terminated outdoor FTTH drop assemblies with made-to-order connectors and lengths. Match the cable construction, each endpoint and the installation route before ordering. For engineered access routes, freeze the port schedule and building-entry detail together. Send the outdoor span or indoor pathway, installation temperature requirement and cable support method; a connector choice alone does not qualify the assembly for the route.
Images show connector and length options, not one fixed assembly or proof of certification. Confirm the ordered configuration and applicable documents.
Product Information
Key Features & Specifications
Common selection references are shown for orientation; final model parameters, construction and availability are confirmed in the quotation and agreed technical documents before ordering.
Main Features
- Connector and length customization
- End A / end B configuration confirmed before production
- Length-by-quantity packing and identification
- Cable, connector and installation accessories quoted as an agreed kit
Technical Specifications
| Connectors | SC / LC / FC / ST / MPO / E2000 and other interfaces can be customized; confirm the exact connector and polish at each end. |
|---|---|
| Termination | One or both ends, identical or different interfaces by order; MPO fibre count, pin gender and polarity require separate confirmation. |
| Finished length | Custom lengths; quote quantity for each length and agree connector-to-connector measurement and tolerance. |
| Fibre selection | Confirm fibre type and count; G.657A1 / G.657A2 and 1 / 2 / 4 fibres are selection options, subject to the assembly drawing. |
| Cable construction | Outdoor jacket, strength member and messenger as required by the route; confirm UV exposure, support/clamps and building-entry transition. |
| Optical acceptance | Confirm insertion loss, return loss, wavelength, test method and report requirement in the order. IEC 61300-3-4 is an attenuation measurement reference, not a universal acceptance limit. |
| Mechanical limits | Tensile load, bend radius, dimensions and temperature depend on the selected cable; use the approved specification, not the connector type. |
| Packing | Individual coil/bag, length label, end identification, carton quantity and OEM marking by agreement. |
Our factory has CE and RoHS documentation and ISO 9001 certification. Images of these documents are available on request.
Applications
RFQ: send one line for each assembly
For engineered access routes, freeze the port schedule and building-entry detail together. Send the outdoor span or indoor pathway, installation temperature requirement and cable support method; a connector choice alone does not qualify the assembly for the route.
- End A and end B: connector type, APC/UPC where applicable, one or two terminated ends.
- Fibre type/count and cable model or required construction.
- Finished length, measurement reference, tolerance and quantity per length.
- Route, entry opening and installation method; check that the protected connector can pass.
- Required insertion/return loss, wavelength, inspection and test records.
- Labels, individual packing, accessories, destination and required delivery date.
An outdoor cable does not make a standard connector waterproof. Specify the enclosure or an agreed sealed interface; do not pull on the connector or boot.
UKCC Project Selection
Confirm the route before fixing the cable construction
UKCC treats the model name as a starting point. The quotation should record the real route, mechanical exposure, compatible accessories and drum or coil allocation before production is released.
- Outdoor reach and support method
- UV, abrasion and entry transition
- Coil length and subscriber allocation
Buyer & Contractor Guide
Indoor or Outdoor FTTH Drop Cable? Define the Building Entry Before You Buy
A route-based guide to indoor, outdoor and self-supporting FTTH drop cable, including jacket, strength member, span, termination and accessory decisions.
Download & Inquiry
Prepare Your Product Inquiry
Download the PDF catalog or use the online catalog to compare related models, then send your required fiber count, quantity and installation route.
Product FAQ
Common Buyer Questions
What route information should the engineering RFQ contain?
For engineered access routes, freeze the port schedule and building-entry detail together. Send the outdoor span or indoor pathway, installation temperature requirement and cable support method; a connector choice alone does not qualify the assembly for the route.
How do I confirm the two endpoint interfaces?
Yes. Define each end separately. Never directly mate an APC endface to a UPC endface; a cable with different ends must match the corresponding port at each end.
Does factory termination remove installation restrictions?
An outdoor cable does not make a standard connector waterproof. Specify the enclosure or an agreed sealed interface; do not pull on the connector or boot.
