Confirm drum schedule, cable length tolerance, jacket legend and destination labels.

Export handover
Cable Drum Packing and Export Handover Record
How approved drum length, jacket marking, protection and shipment evidence are checked before loading.
This evidence-based record focuses on the last stage between finished cable and export handover, using available factory, packing and loading documentation.
Project control point
Correct cable can still cause site delays when drum lengths, labels, protection or the packing list do not match the project plan.
VERIFIABLE WORKFLOW
Control steps
Check drum condition, cable-end sealing and protective packing.
Match drum numbers to the packing list and available test records.
Photograph finished packing and loading for the shipment file.

DOCUMENT CHECK
Evidence available for review
- Drum and label photographs
- Cable-end protection
- Drum list and batch references
- Loading evidence
Handover result
The order leaves the factory with a traceable drum list and visual handover evidence for the importer or contractor.
